Renovations and fit outs in the Sydney metropolitan area
Bathroom strip-outs, waterproofing, tiling and services rough-in for houses, terraces and boutique commercial suites.
Bathroom and fit-out work done properly
Fixed wet-area sequencing, transparent allowances, and local warranty support after handover.
Fixed wet-area sequencing
No tilers arriving before membranes cure; hold points match AS 3740 flood-test requirements.
Transparent allowances
PC items listed with SKU numbers and supply lead times so committees see where money goes.
Local warranty support
We return for silicone checks twelve months after handover, with no chasing offshore suppliers.
Apartment or terrace bathroom: we confirm lift bookings and acoustic protection before demolition starts.
Call 0435 253 785
Designed for real Sydney homes
Apartments from Bondi to Bankstown share the same headaches: tight lifts, acoustic floors and owners corporations that want wet works finished fast. We strip bathrooms in controlled stages, isolate dust with negative air where required and sheet-protect common corridors before a single tile is lifted.
Our joinery and electrical partners understand Australian Standard waterproofing details, slip-resistant gradients and accessible turning circles for NDIS participants. Whether you are refreshing a family ensuite or fitting out a medical suite, you get one Velocity CG supervisor tracking the programme daily.
Email photos and scopeProgress invoices align with waterproofing milestones, and you only pay when hold points pass.
0435 253 785
What is involved
- Measured site survey, sample boards and fixture schedules signed off before demolition.
- Licensed demolition, waste tracking and acoustic mat protection in multi-res buildings.
- Two-coat membrane systems, screed falls to floor wastes and flood testing prior to tiling.
- Final silicone, exhaust commissioning and photo handover for strata managers.
Work starts after 7.00am once your building manager confirms lift bookings. We run loud cutting inside statutory hours, tidy the car park bay nightly and store materials on stillages to keep fire egress clear.
Request a written quoteWhat homeowners say about our renovations
Bathroom and fit-out projects across apartments and terraces.
“Strata wanted method statements and acoustic mats before we even voted. Velocity supplied everything for the committee meeting and stuck to the programme.”
Owner, Eastern Suburbs apartment
“They flood-tested before tiles and sent photos to our building manager each week. No surprises on the final invoice.”
Homeowner, Inner West terrace
“Twelve months later they came back for silicone checks like they promised. Rare in this trade.”
Owner, Bankstown unit
Need strata by-law packs or insurance certificates? We format documentation for Sydney committees.
Email Velocity CGProject photography
Completed bathroom and fit out work in Malabar: herringbone travertine, freestanding bath, double vanity with brass tapware and custom walk-in robe joinery.
Frequently asked questions
How long does a typical apartment bathroom take?
Allow four to six weeks once materials are on site. Waterproofing and curing consume about a third of that time because we follow AS 3740 flood-test requirements before tiles go down. Delays usually come from imported tapware, which we flag during quoting.
Do I need strata approval before you start?
Yes. Sydney strata schemes require renovation by-laws, insurance certificates and sometimes acoustic reports. We supply method statements, SDS packs and photos for committee meetings so approvals move faster.
Can you match existing cornice and skirting profiles?
We take mould samples or source like-for-like from Sydney plaster suppliers. Where heritage overlays apply, we document finishes for council compliance before painting begins.