Renovations and fit outs in the Sydney metropolitan area
Bathroom strip-outs, waterproofing, tiling and services rough-in for houses, terraces and boutique commercial suites.
Designed for real Sydney homes
Apartments from Bondi to Bankstown share the same headaches: tight lifts, acoustic floors and owners corporations that want wet works finished fast. We strip bathrooms in controlled stages, isolate dust with negative air where required and sheet-protect common corridors before a single tile is lifted.
Our joinery and electrical partners understand Australian Standard waterproofing details, slip-resistant gradients and accessible turning circles for NDIS participants. Whether you are refreshing a family ensuite or fitting out a medical suite, you get one Velocity CG supervisor tracking the programme daily.
What is involved
- Measured site survey, sample boards and fixture schedules signed off before demolition.
- Licensed demolition, waste tracking and acoustic mat protection in multi-res buildings.
- Two-coat membrane systems, screed falls to floor wastes and flood testing prior to tiling.
- Final silicone, exhaust commissioning and photo handover for strata managers.
What to expect on site
Work starts after 7.00am once your building manager confirms lift bookings. We run loud cutting inside statutory hours, tidy the car park bay nightly and store materials on stillages to keep fire egress clear. Progress invoices align with waterproofing milestones so you only pay when hold points pass.
Three benefits homeowners notice
- Fixed wet-area sequencing: No tilers arriving before membranes cure.
- Transparent allowances: PC items listed with SKU numbers and supply lead times.
- Local warranty support: We return for silicone checks twelve months after handover.
Frequently asked questions
How long does a typical apartment bathroom take?
Allow four to six weeks once materials are on site. Waterproofing and curing consume about a third of that time because we follow AS 3740 flood-test requirements before tiles go down. Delays usually come from imported tapware, which we flag during quoting.
Do I need strata approval before you start?
Yes. Sydney strata schemes require renovation by-laws, insurance certificates and sometimes acoustic reports. We supply method statements, SDS packs and photos for committee meetings so approvals move faster.
Can you match existing cornice and skirting profiles?
We take mould samples or source like-for-like from Sydney plaster suppliers. Where heritage overlays apply, we document finishes for council compliance before painting begins.